• Login
    View Item 
    •   DSpace Home
    • SUNY Polytechnic Institute
    • SUNY Poly Undergraduate Projects and Research
    • Engineering Capstone Projects
    • View Item
    •   DSpace Home
    • SUNY Polytechnic Institute
    • SUNY Poly Undergraduate Projects and Research
    • Engineering Capstone Projects
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Outpatient Surgery Center, Brownfield Redevelopment, 530 Henry Street, Rome NY: CTC 490 Spring 2016

    Thumbnail
    View/Open
    Presentation Provided at end of CTC 490 Course (4.872Mb)
    Estimating and Scheduling Engineering Report for CTC 490 Spring 2016 (506.3Kb)
    LEED Engineering Report for CTC 490 Spring 2016 (451.2Kb)
    Site Design Engineering Report for CTC 490 Spring 2016 (610.3Kb)
    Stormwater Engineering Report for CTC 490 Spring 2016 (1.098Mb)
    Structural Engineering Report for CTC 490 Spring 2016 (605.0Kb)
    Traffic Engineering Report for CTC 490 Spring 2016 (288.7Kb)
    Utilities Engineering Report for CTC 490 Spring 2016 (424.0Kb)
    Foundation Plan (Drawing) CTC 490 Spring 2016 (358.2Kb)
    Foundation/Footings (Drawing) CTC 490 Spring 2016 (384.1Kb)
    Column Layout and Details (Drawing) CTC 490 Spring 2016 (162.2Kb)
    First Floor Framing (Drawing) CTC 490 Spring 2016 (152.5Kb)
    First Floor Framing (Drawing) CTC 490 Spring 2016 (152.5Kb)
    Roof Framing (Drawing) CTC 490 Spring 2016 (155.3Kb)
    Carport Section Framing Details (Drawing) CTC 490 Spring 2016 (168.5Kb)
    Proposed Site Conditions (Drawing) CTC 490 Spring 2016 (168.2Kb)
    Grading Plan (Drawing) CTC 490 Spring 2016 (140.3Kb)
    Existing Site Conditions (Drawing) CTC 490 Spring 2016 (132.1Kb)
    Utility Plan (Drawing) CTC 490 Spring 2016 (144.8Kb)
    Storm Water Plan (Drawing) CTC 490 Spring 2016 (131.6Kb)
    Storm Water Plan 2 (Drawing) CTC 490 Spring 2016 (357.1Kb)
    Cover Sheet (Drawing) CTC 490 Spring 2016 (159.1Kb)
    Video of CTC 490 Capstone Presentation Spring 2016 (759.8Mb)
    Date
    2016-05-01
    Author
    Paramount Engineering
    Metadata
    Show full item record
    Subject
    CTC 490 Spring 2016
    Outpatient Surgical Center
    Description
    The goal of the completed project is to assemble a set of construction plans, specifications and estimate/schedule for the provided project and location. The project site is located at the intersection of South Jay Street and Henry Street in the city of Rome, New York. This site was previously the location of the Rome Cable, Bare wire facility which has since been demolished and removed with the exception of the Rome Cable Tower, no subsurface environmental hazards are believed to exist. The proposed project to be constructed is a 24-hour outpatient and surgical center, the structure will be a two story building with onsite parking for employees and patients. The site must follow all the codes set by the city of Rome, the New York State building code and the Oneida County building code. Additionally all utilities should connect to city facilities and a TIS (traffic impact study) should be conducted on the intersection nearest to the site and State Route 46, this is the intersection of South Madison Street and Erie Boulevard.
    URI
    http://hdl.handle.net/1951/67475
    Collections
    • Engineering Capstone Projects [6]

    SUNY Digital Repository Support
    DSpace software copyright © 2002-2021  DuraSpace
    Contact Us | Send Feedback
    DSpace Express is a service operated by 
    Atmire NV
     

     


    SUNY Digital Repository Support
    DSpace software copyright © 2002-2021  DuraSpace
    Contact Us | Send Feedback
    DSpace Express is a service operated by 
    Atmire NV