Old Main Auditorium, 1924
Date
2011-08-19Metadata
Show full item recordDescription
The interior of the auditorium in the new building. The arched openings flanking the stage were built to contain an organ, but the State never appropriated funds for an instrument. The lofts were used for storage of flats and props used in dramatic productions until 1989, when the Link organ was installed.Collections
- Archives [405]